This
project is to propose and evaluate improvements to the Plank Road (S.R.
1001) corridor in Altoona, PA, near Logan Valley Mall, and the interchange
with I-99. This project includes evaluating intersections and corridor
capacities along Plank Road from the Parkvew/Sheraton Driveways to the
Toys ‘R’ Us Driveway
(including the interchange with I-99), along Goods Lane from the Kaufmann’s
Driveway to Plank Road, and along Orchard Ave. from Plank Road to the
Orchard Plaza Driveway. Please refer to the Alternates to view proposed
improvements to the corridor. |
|
|
Click Thumbnail
for PDF |
|
| In addition
to the intersection improvements, the interchange between Plank Road and
I-99 is also being studied to improve access to the interstate traffic
flow through the interchange area. The first alternate for the interchange
is an upgrade of the existing ramps to provide additional turning lanes
and storage capacity on the existing ramps. This alternate will work with
either the LOS C or D scenario. The second interchange alternate is a
Single Point Urban Interchange (SPUI) configuration. This alternate consolidates
all left turn movements to a single signal located under the overhead
structures. This alternate is also compatible with either the LOS C or
D alternate. |
|
| The
LOS C alternate would begin widening Plank Road just north of its intersection
with Plank Road Commons Driveway (south). Plank Road would be widened
to as many as eight (8) lanes to add left turn and through traffic capacity,
tying into existing conditions, just north of the Arby’s Restaurant.
Goods Lane will be widened to four (4) lanes at the Kaufmann’s Driveway,
and six (6) lanes at the intersection with Plank Road. Orchard Avenue
would be widened to five (5) lanes between Plank Road and Orchard Plaza
Driveway. In order to complete this design, it is anticipated that three
(3) retaining walls will be utilized to minimize impacts to parking areas,
driveways, and Mill Run. |
|
| The LOS D alternate would begin widening Plank Road just south of the Parkview Drive/Sheraton Drive intersection. Plank Road would be widened to as many as eight (8) lanes to add left turn and through traffic capacity, tying into existing conditions, just north of the Arby’s Restaurant. Goods Lane will be widened to three (3) lanes at the Kaufmann’s Driveway, and six (6) lanes at the intersection with Plank Road. Orchard Avenue would be widened to five (5) lanes between Plank Road and Orchard Plaza Driveway. In order to complete this design, it is anticipated that one (1) retaining wall will be utilized to minimize impacts to parking areas. | |